Call In The Crane
Sometimes the only way you can possible deliver a spa is by crane. This job required the crane to lift the spa tub over the house from the front yard and down on to the upper level of this deck in the back.
Built by: Dave Finneran
Home > Pictures of Decks > Hot Tub Decks > Call In The Crane
May 14, 21 11:59 AM
Replacing my southeast MI 30-year-old deck, was hoping just to replace the surface boards but many of the posts were set too deep and rotted at ground
Apr 29, 20 01:36 PM
I am looking to install privacy screens on my concrete patio. I just want to put up two 6x6 posts with Titan Wood Post Anchors, either 35 or 70 apart,
Apr 28, 20 11:17 AM
I am building a 10'x12'deck (not attached to a ledger board). My plan was to pour concrete footings, then run doubled up 2x8 beams setting on the footings
© 2004-2021 Decksgo.com. All Rights Reserved.